Home
Factory location shows
Product Catalog
News
Company social media
Contact Us

Product Catalog 

crusher special backing adhesives,liner plate repair filling material

  • crusher special backing adhesives,liner plate repair filling material
  • crusher special backing adhesives,liner plate repair filling material
  • crusher special backing adhesives,liner plate repair filling material
  • crusher special backing adhesives,liner plate repair filling material
  • crusher special backing adhesives,liner plate repair filling material
Model No.︰BD66
Brand Name︰Baidun
Country of Origin︰China
Unit Price︰US $ 9.5 / Kg
Minimum Order︰100 Kg
Share on:

 Total 16 Related Items 
Prev1213141516Next
Auto next page:   SecondsPlay

Product Description

Packing specification: 
 20Kg/group,packed in a iron drum.

 

performance features:
 ☆  Before curing:with good fluidity and strong filling ability,easy to operate,safety and environmental protection
 ☆  After curing:with low shrinking percentage and good adhesion,bearing capacity is high,can tear down
 ☆ Can cure at the low temperature of -5℃
 ☆ With high impact resistant ability,especially suitable for the lining plate filling of coarse broken gyration type crusher

 

BD66 crusher special wear resistant filling material product usage:
        BD66 crusher filling material (backing adhesives)  is used in the filling/supporting between crusher lining plate and substrates,gravel barrels and jacket clearance,support cone and protective layer space,at the same time it can be used as buffer material,when the equipment suffers impacting or load vibration from broken ore, also used in the structural reinforcement,impact resistant vibration of ball mill wear resistant lining plate and cylinder clearance.

BD66 crusher lining plate protective filling adhesives performance index:
Polyurethane modified epoxy material,two component ,red fluid              
Color: A component: light red, B component: light yellow
Viscosity: A component: 1000, B component: 700mPa.s(GB/T2791-1995)
Density:A component: 1.5, B component: 1.06g/cm3 (GB/T13354-1992)
Compressive strength after curing:130 Mpa (GB/T2791-1995)
Shear strength after curing:10.1 Mpa (GB/T7124-1996)
Hardness after curing:Shore A90 (GB/T2144-1980)
Shrinkage ratio after curing: 0.01%
Cooperation ratio(A : B),weight ratio 5:1,volume ratio  3.2:1
Pot life:15 min,the shortest curing time before operation:24h
Operation temperature:5℃-30℃
The temperature resistant after curing:-60℃-100 ℃
 Impact resistant test:Using 50 tons air hammer to hammer the φ50 stone for 5 times,the stone is not dehiscent.

BD66 crusher repair backing adhesives use technology:
1  Cleaning up and preparation:  clean up the residual filling material on the surface of the cone, as well the grease dirt and smudge on the areas where touched with the adhesive,then fit up the cone and lining plate.Seal up the cone/lining plate fitting surface and annular ring with the adhesive tape etc,for fear of adhesive leakage,and protect the screw threads on the shafts if necessary,try to construct under the temperature of 5℃-30 ℃ during using.
2 Configure adhesive: Make the blender fix on low speed electric hand drill,Open the A component of BD66 crusher filling material,stir it for 1 minute,then pour the B component into the A component drum at the same time stir it with the electric blender,it's OK for color uniform,general stirring time is not more than 4 minutes.
Operation time: The total time from start mixing to finish filling is not more than 15 minutes(the data for 20℃)
3  Pouring:  Make the mixed-up BD66 adhesive solution pour into it along the cone or a place of lining plate crack,easy to exhaust,in necessity,can make a cofferdam guide with plasticine etc,until overflow from the top of crack.Don’t pour into the adhesive without mixing uniformly(with different colors)
4 Curing: Place to cure for 12-24 hours,the temperature makes a big difference for the curing time,the curing speed is fast for high temperature,it can put into using to cure for 24 hours.

Transportation storage:
BD66 crusher filling material is the general chemicals,should pay attention to waterproof and preventing fire in the process of transportation and storage,stored in a cool and dry place,the storage period is 6 months.

http://www.realbond.net/en/crusher_filling_material_backin/4144.html

Payment Terms︰30% T/T in advance as the deposit,the balance T/T before shipment
Product Image






Related Products
magnetic separator anti abrasion chemical resistant protective coatings
magnetic separator anti abrasion chemical resistant protective coatings
US $ 6.8
desulfurization tower and slurry pipeline anti wear chemical resistant coating
desulfurization tower and slurry pipeline anti wear chemical resistant coating
US $ 6.8
high temperature abrasion resistant silicon carbide coatings
high temperature abrasion resistant silicon carbide coatings
US $ 6.8
high temperature impact and wear resistant protective coating
high temperature impact and wear resistant protective coating
US $ 6.8




Home  |  Factory location shows  |  Product Catalog  |  News  |  Company social media  |  Contact Us  |  Sitemap  |  Mobile Version

Powered by DIYTrade.com  Build your FREE website !
Find Best Price For China Products !